Favourite listing
Favourite listing
Favourite listing
Favourite listing

Unnamed

Last 5% Remains - ONLY $440 for a 5% lease share in a very well bred ALL TOO HARD filly!

Sold

View pedigree

(GST inclusive)




Particulars
Name:
Unnamed
Category:
Sire:
All Too Hard (AUS) 2009
Dam:
Extension of Time (AUS) 2004
Colour:
Bay
Sex:
Filly
DOB:
22 November 2018
COB:
Australia
AFS no:
226787
Rep no:
001238227
Location:
Hawkesbury Heights 2777 NSW, Australia
X-rayed?:
Yes
Scoped?:
Yes

Trained by:

Trainer: Brad Widdup
Location: Hawkesbury Heights 2777 NSW View map »

Bonus incentive schemes:

NSW Breeder Owner Bonus Scheme (Eligible)

Reports:

Trainer's letter
View »

Vet certificate
View »

Approval letter
View »

Location
Description

Come race this outstanding filly with Flying Start Syndications - Lease Shares Only $440


Very well bred filly By ALL TOO HARD out of a Black Type Mare EXTENSION OF TIME!


ALL TOO HARD is stallion on FIRE!!!!!!!!!!!!!!


Recently the stallion has produced amazing results...


ALLIGATOR BLOOD - (GROUP 1 WINNER)
DAWN DAWN - (GROUP 2 WINNER)
HARD ROCK GIRL - (LISTED WINNER)
CUBA - (LISTED WINNER)


HURRY SHARES WON'T LAST LONG AT THIS PRICE


ONLY $440 TO RACE A VERY WELL BRED FILLY!
Share price includes breaking in, transport, veterinary costs, PDS & registration fees.


Ongoing costs approx $50 a week for a 5% share


This Filly will be trained by the in form BRAD WIDDUP and will be targeted towards all the big major Black Type races.


FOR MORE INFORMATION OR TO RESERVE YOUR SHARE IN THIS OUTSTANDING FILLY


CALL US TODAY - CAMERON BENNETT (0406 568 500) or JUSTIN ALPAR (0414 836 209)

Please read the Product Disclosure Statement (PDS) associated with this horse before considering this investment
Location

Make an Enquiry

Cameron Bennett , Flying Start Syndications

PO Box 5349, Maroochydore BC 4558 QLD, Australia

Mobile
0406 568 500
Int'l mobile
+61406568500

Website: http://www.flyingstartsyndications.com.au

Use this form to send a message to the advertiser:

This service is only available for offers of $1,000 or above

Pedigree

Pedigree

 

 

UNNAMED
Bay filly       Foaled 22nd November 2018 
 

ALL TOO HARD Casino PrinceFlying SpurDanehill (USA)
Lady CapelLast Tycoon (Ire)
HelsingeDesert Sun (GB)Green Desert
ScandinaviaSnippets
EXTENSION OF TIME
    2004
Dash for CashSecret Savings (USA)Seeking the Gold
GulistanRubiton
Nina HarakaFraar (USA)Topsider
La NebbiaZephyr Bay

ALL TOO HARD (AUS) (Bay 2009-Stud 2013). 7 wins-3 at 2, ATC All Aged S., Gr.1. Sire of 342 rnrs, 215 wnrs, 16 SW, inc. Alligator Blood (VRC Australian Guineas, Gr.1), Frosted Gold, Villermont, Tarka, Dawn Dawn, Demonetization, Amangiri, Roy's Riviera, Hard Landing, Hard Rock Girl, Behemoth, Unfair Dismissal, All Too Huiying, All Too Royal, Cuba, Curdled, SP Saas Fee, Cristal Eyes, Outrageous, All Too Soon, Hardly Surprising, Superhard, etc.

 

1st dam

EXTENSION OF TIME, by Dash for Cash. 4 wins-3 at 2-to 1300m, A$330,785, SAJC Walter Brown S., L, TTC Magic Millions 2YO Classic, VRC Michael & Goldie Mazur H., SAJC Calvary College Grove 2YO P., 2d MRC Thousand Guineas, Gr.1, TTC Gold Sovereign S., L, 3d MRC ESP Tecforce 2YO P., 4th VRC Edward Manifold S, Gr.2. Half-sister to Levi's Choice. This is her eighth living foal. Her seventh foal is a 2YO. Dam of 6 foals to race, all winners-

 Time Commands (f by Commands) 5 wins to 1300m, A$105,080, TTC Craig Hanson Memorial H., Burnie Newsagency H., AJ Gallagher Insurance Broker H., TRC Crown Lager H., 2d TTC Grenville Stud H., Devonport RC Think Pink Cup, Tasracing.com.au H., 3d MVRC City Jeep P., TTC Launceston Cup Raceday H., Samios H., Armidale Stud H., Devonport RC AJ Skirving Memorial H., Leading Jockey Raquel Clark H., 4th TRC Bow Mistress S., Gr.3.

 Noble Steed (g by Street Cry (Ire)) 4 wins at 1400m, HK$4,715,000, to 2019-20, HKJC BOC Credit Card H., Po Leung Kuk Cup, Plantation H., Lukfook Jewellery Dear Q H., 2d HKJC Highland Reel H., Tai Ping Shan H., Citi Insurance Services H., Entrapment H., Yan Oi Tong Cup, 3d HKJC Panasonic OLED TV H.

 Morrissy (c by Snitzel) 3 wins at 1100m, 1200m, A$341,200, in 2018-19, MRC Ladbrokes Cash Out H., Robert Taranto H., 2d MVRC Ladbrokes 55 Second Challenge Heat 3 H., 3d GCTC Magic Millions Snippets P., Magic Millions Rising Stars, VRC Lounge Trophy H., MVRC Daemco H.

 Time to Rock (g by Fastnet Rock) 2 wins at 2000m, 2150m, Ipswich TC Melbourne Cup Luncheon H., 3d MVRC Essendon Hyundai P.

 Ocean de Lago (g by Encosta de Lago) 2 wins at 1200m, 1400m, Singapore TC Class 4 H., 3d Singapore TC Class 4 H.

 Mr Deadline - King's Horn (H.K.) (g by More Than Ready (USA)) Winner at 2 in 2018-19 in Aust.

 

2nd dam

NINA HARAKA, by Fraar (USA). 5 wins-1 at 2-from 1000m to 1800m, A$403,390, SAJC Adelaide Guineas, Gr.3, HC Nitschke S., L, Port Adelaide Guineas, L, Advertiser H., Denhoti 2YO H., 2d VATC Vic Health Cup, Gr.1, Toorak H., Gr.1, SAJC Auraria S., Gr.3, Matt Caude 2YO H., Flowers Hyde Park 2YO H., 3d VRC Emirates S., Gr.1, MVRC Australia S., Gr.1, VATC Shankhill Lass H. Sister to  Monte Rosa (dam of SNITZERLAND, SOOBOOG), half-sister to  Tennessee Royal (dam of PERGRAM),  Consistency (dam of PRAIRIE FIRE). Dam of 5 foals, 4 to race, 3 winners, inc:-

EXTENSION OF TIME (f Dash for Cash) 4 wins. See above.

Levi's Choice (g Galileo) 2 wins-1 at 2-at 1400m, 1900m, A$170,950, BRC Ambassador Travel 2YO P., ATC Bacardi World's No. 1 Rum H., 2d ATC South Pacific H., L, Flinders Lane Perfect Fit Shirt H.-twice, 3d BRC Sires' Produce S., Gr.2, NSW Tatt's RC Ming Dynasty H., L, Hawkesbury RC Reavill Farm Inglis Series 2YO H., ATC Echo Entertainment Group H., 4th ATC Shannon S., Gr.2.

 

3rd dam

LA NEBBIA, by Zephyr Bay. Placed, 2d SAJC Lefroy H. Half-sister to Minsky Lass. Dam of 10 foals, 7 to race, 4 winners, inc:-

NINA HARAKA (f Fraar) 5 wins. See above.

 Tennessee Royal. 2 wins at 1350m, 1450m, SAJC Radio TAB H. Dam of 2 winners-

PERGRAM (f General Nediym) Winner at 2, SAJC Queen Adelaide S., L, 2d MRC Thomas North P., 4th SAJC Pewsey Vale S., L. Producer.

 Consistency. Unraced. Dam of 2 winners-

PRAIRIE FIRE (g Snitzel) 2 wins-1 at 2-at 1050m, 1100m, A$215,850, to 2019-20, VRC Talindert S., L, SAJC Terry Howe Printing H., 3d MRC Chairman's S., Gr.3, VRC Inglis Dash, 4th MRC Blue Diamond S., Gr.1.

 Monte Rosa. Unraced. Dam of 8 winners-

SNITZERLAND (f Snitzel) 8 wins-2 at 2-to 1200m, A$1,974,500, VRC Lightning S., Gr.1, Danehill S., Gr.2, ATC Challenge S., Gr.2, VRC Thoroughbred Breeders S., Gr.3, ATC San Domenico S., Gr.3, MVRC Champagne S., Gr.3, MRC (Mornington) Inglis Premier 2YO S., MRC Blue Sapphire S., 2d ATC Golden Slipper S., Gr.1, Galaxy H., Gr.1, Challenge S., Gr.2, VRC Dilmah Earl Grey S., L, Ottawa S., L, 3d BRC Victory S., Gr.2, 4th ATC Reisling S., Gr.2. Dam of 2 winners-

HARD LANDING (c All Too Hard) Winner at 2, A$121,500, in 2019-20, VRC Maribyrnong P., Gr.3.

SOOBOOG (c Snitzel) 3 wins at 1100m, 1200m, A$272,575, VRC Aurie's Star H., Gr.3, ATC Tab.com.au H., Cellarbrations H., 2d SAJC Euclase S., Gr.2, VRC Goodwood Racecourse Trophy H., L, ATC Breeders' P., L, 4th VRC AR Creswick Series Final S., L.

Red Dress Marley (f Hussonet) 2 wins-1 at 2-at 1200m, 1400m, SAJC Allan Scott Park Morphetville H., Peggy McKinnon H., 2d MRC Debutant S., L. Producer.